RemodelerIQ
RemodelerIQ Tools
2026 National Cost Intel

Addition Cost
by City — 2026

A addition runs $21,833–$115,587 nationally, typically around $46,149. Pick your metro below for local 2026 pricing backed by live BLS labor data.

Low range
$21,833
Typical
$46,149
High range
$115,587

Addition cost in 152 US metros

San Francisco, CA
$38,529–$115,587
San Jose, CA
$38,015–$114,046
New York, NY
$37,245–$111,734
Honolulu, HI
$36,474–$109,423
Los Angeles, CA
$35,960–$107,881
Santa Cruz, CA
$35,447–$106,340
Santa Barbara, CA
$34,933–$104,799
San Diego, CA
$34,676–$104,028
Seattle, WA
$34,676–$104,028
Santa Rosa, CA
$33,906–$101,717
Washington, DC
$33,906–$101,717
Oxnard, CA
$33,392–$100,176
Riverside, CA
$33,392–$100,176
Salinas, CA
$33,392–$100,176
Boston, MA
$32,878–$98,634
Fairbanks, AK
$32,878–$98,634
Stockton, CA
$32,108–$96,323
Bridgeport, CT
$31,851–$95,552
Vallejo, CA
$31,851–$95,552
Denver, CO
$31,337–$94,011
Miami, FL
$31,337–$94,011
New Haven, CT
$30,823–$92,470
Portland, OR
$30,823–$92,470
Trenton, NJ
$30,310–$90,929
Worcester, MA
$30,310–$90,929
Boulder, CO
$29,796–$89,387
Sacramento, CA
$29,796–$89,387
Philadelphia, PA
$29,539–$88,617
Poughkeepsie, NY
$29,282–$87,846
Baltimore, MD
$28,255–$84,764
Bend, OR
$28,255–$84,764
Modesto, CA
$28,255–$84,764
Springfield, MA
$28,255–$84,764
Albany, NY
$27,741–$83,223
Allentown, PA
$27,741–$83,223
Bellingham, WA
$27,741–$83,223
Fresno, CA
$27,741–$83,223
Olympia, WA
$27,741–$83,223
New Orleans, LA
$27,484–$82,452
Reno, NV
$27,227–$81,682
Santa Fe, NM
$27,227–$81,682
Ann Arbor, MI
$26,970–$80,911
Austin, TX
$26,970–$80,911
Chicago, IL
$26,970–$80,911
Detroit, MI
$26,970–$80,911
Eugene, OR
$26,970–$80,911
Las Vegas, NV
$26,970–$80,911
Minneapolis, MN
$26,970–$80,911
Nashville, TN
$26,970–$80,911
Salem, OR
$26,970–$80,911
Hartford, CT
$26,713–$80,140
Providence, RI
$26,713–$80,140
Milwaukee, WI
$26,457–$79,370
Atlanta, GA
$26,200–$78,599
Charlottesville, VA
$26,200–$78,599
Duluth, MN
$26,200–$78,599
Fort Collins, CO
$26,200–$78,599
Harrisburg, PA
$26,200–$78,599
Madison, WI
$26,200–$78,599
Rochester, MN
$26,200–$78,599
Rochester, NY
$26,200–$78,599
Dallas, TX
$25,686–$77,058
Green Bay, WI
$25,686–$77,058
Lancaster, PA
$25,686–$77,058
Missoula, MT
$25,686–$77,058
North Port, FL
$25,686–$77,058
Orlando, FL
$25,686–$77,058
Pittsburgh, PA
$25,686–$77,058
Raleigh, NC
$25,686–$77,058
Salt Lake City, UT
$25,686–$77,058
Spokane, WA
$25,686–$77,058
Syracuse, NY
$25,686–$77,058
Tampa, FL
$25,686–$77,058
Boise, ID
$25,429–$76,288
Colorado Springs, CO
$25,429–$76,288
Albuquerque, NM
$25,172–$75,517
Asheville, NC
$25,172–$75,517
Buffalo, NY
$25,172–$75,517
Charlotte, NC
$25,172–$75,517
Greensboro, NC
$25,172–$75,517
Jacksonville, FL
$25,172–$75,517
Phoenix, AZ
$25,172–$75,517
Provo, UT
$25,172–$75,517
Richmond, VA
$25,172–$75,517
Scranton, PA
$25,172–$75,517
St. Louis, MO
$25,172–$75,517
Tucson, AZ
$25,172–$75,517
Virginia Beach, VA
$25,172–$75,517
Billings, MT
$24,915–$74,746
Cape Coral, FL
$24,915–$74,746
Charleston, SC
$24,915–$74,746
Des Moines, IA
$24,915–$74,746
Lansing, MI
$24,915–$74,746
Ogden, UT
$24,915–$74,746
Akron, OH
$24,659–$73,976
Cincinnati, OH
$24,659–$73,976
Cleveland, OH
$24,659–$73,976
Columbus, OH
$24,659–$73,976
Durham, NC
$24,659–$73,976
Grand Rapids, MI
$24,659–$73,976
Houston, TX
$24,402–$73,205
Kansas City, MO
$24,402–$73,205
Omaha, NE
$24,402–$73,205
San Antonio, TX
$24,402–$73,205
Toledo, OH
$24,402–$73,205
Appleton, WI
$24,145–$72,435
Cedar Rapids, IA
$24,145–$72,435
Deltona, FL
$24,145–$72,435
Indianapolis, IN
$24,145–$72,435
Lakeland, FL
$24,145–$72,435
Myrtle Beach, SC
$24,145–$72,435
Roanoke, VA
$24,145–$72,435
South Bend, IN
$24,145–$72,435
Dayton, OH
$23,888–$71,664
Gainesville, FL
$23,888–$71,664
Greenville, SC
$23,888–$71,664
Lincoln, NE
$23,888–$71,664
Savannah, GA
$23,888–$71,664
Winston-Salem, NC
$23,888–$71,664
Baton Rouge, LA
$23,631–$70,893
Columbia, SC
$23,631–$70,893
Fort Wayne, IN
$23,631–$70,893
Knoxville, TN
$23,631–$70,893
Lexington, KY
$23,631–$70,893
Pensacola, FL
$23,631–$70,893
Youngstown, OH
$23,631–$70,893
Chattanooga, TN
$23,374–$70,123
Evansville, IN
$23,374–$70,123
Huntsville, AL
$23,374–$70,123
Tallahassee, FL
$23,374–$70,123
Augusta, GA
$23,117–$69,352
Corpus Christi, TX
$23,117–$69,352
El Paso, TX
$23,117–$69,352
Fayetteville, NC
$23,117–$69,352
Lafayette, LA
$23,117–$69,352
Louisville/Jefferson County, KY
$23,117–$69,352
Tulsa, OK
$23,117–$69,352
Wichita, KS
$23,117–$69,352
Fayetteville, AR
$22,861–$68,582
Little Rock, AR
$22,861–$68,582
Mobile, AL
$22,861–$68,582
Shreveport, LA
$22,861–$68,582
Springfield, MO
$22,861–$68,582
Waco, TX
$22,861–$68,582
Amarillo, TX
$22,604–$67,811
Jackson, MS
$22,604–$67,811
Lubbock, TX
$22,604–$67,811
Memphis, TN
$22,604–$67,811
Montgomery, AL
$22,604–$67,811
Oklahoma City, OK
$22,604–$67,811
Birmingham, AL
$21,833–$65,499
McAllen, TX
$21,833–$65,499

Where the money goes: labor vs. materials

Across the 152 metros tracked, labor averages about 50% of a addition budget and materials about 50%. When you review a bid, judge its labor line against your metro's trade wages — the biggest source of overpricing we see — not a national average.

How we calculate these numbers

Every figure on this page is a blend of three independent cost sources — construction cost data (70%), homeowner-reported project spend (15%), and live U.S. Bureau of Labor Statistics trade wages (15%) — localized to each metro with a regional cost factor and a current-year escalation index. Ranges refresh as the underlying wage and materials data moves, which is why they're dated 2026 rather than recycled from older surveys.

Full scoring methodology →

Permits for a addition

Budget another 0.5–2% of project value for permit fees. Rules and turnaround vary by city.

Building permit fees by city →

Addition costs: FAQ

How much does a addition cost in 2026?
A addition typically costs $21,833 to $115,587 in 2026, with a national median around $46,149. Actual pricing varies by metro — San Francisco runs highest and McAllen lowest among the 152 markets tracked here.
Which cities have the highest addition costs?
Among the 152 metros tracked, San Francisco, San Jose, New York carry the highest addition costs in 2026, driven by local labor wages and material logistics. McAllen sits at the lower end.
Why does addition cost vary so much by city?
The same addition scope is priced differently across metros because of local trade wages, permit timelines, and material delivery costs. RemodelerIQ localizes every estimate using live 2026 BLS wage data for each metro rather than a single national average.
How do I know if my addition bid is fair?
Find your city below for the local 2026 range, then compare your contractor's bid against it. RemodelerIQ analyzes your actual PDF estimate against live local labor and material data for free, flagging padded scope and inflated margins.
How much of a addition cost is labor vs. materials?
Across the 152 metros tracked, labor averages about 50% of a addition budget and materials about 50%. The split shifts with finish level and local wages — which is why a bid's labor line should be judged against local rates, not national ones.
Do I need a permit for a addition?
Most addition projects that touch structure, electrical, or plumbing require permits; purely cosmetic scopes usually don't. Permit fees typically run 0.5–2% of project value. See our city-by-city building permit guides for local fees, rules, and timelines.

Got a addition bid?

We audit your PDF estimate against live local wage data to flag padded scope and hidden margins — free.

Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.

Our Goal
Build Your Confidence

Ready to Score Your Bid?

Upload your contractor's estimate and get instant, data-backed analysis.

Analyze Your Bid