Permit fees for a ADU or garage conversion in Boise typically run $775–$3,150. Here's exactly which permits you need, what they cost, and how long ID review takes.
Always — converting space into a dwelling unit triggers full plan review, zoning approval, and utility sign-offs in Boise. Permit fees for a typical $157,262 ADU or garage conversion run about $775–$3,150 (valuation-based fee plus plan review), and ID plan review typically takes 2–5 weeks.
full plan review for the dwelling conversion
ADU ordinance compliance and occupancy approval
sewer, water, and electrical service connections
separate egress and smoke/CO requirements
Nothing meaningful — every part of a ADU or garage conversion runs through permitting. Budget for it up front.
Rapid Growth Quality Issues: Boise area growth has created quality concerns Fast-paced construction leads to shortcuts. Reddit recommends careful inspections and established contractors.
Building, Zoning / occupancy, Utilities, Fire / egress permits apply when the scope includes full plan review for the dwelling conversion. Cosmetic-only scopes may be exempt.
Plan for $775–$3,150 in Boise — a valuation-based fee on a typical $157,262 project plus plan review.
Submit scope, drawings, and contractor license info to the Boise building department. ID plan review typically takes 2–5 weeks.
A complete Boise bid lists permit fees as a line item. If a bid omits permits — or suggests skipping them — analyze it before signing.
A typical Boise ADU or garage conversion runs $157,262. Check your contractor's bid — permits included — against live 2026 local data, free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.
Upload your contractor's estimate and get instant, data-backed analysis.
Analyze Your Bid