Permit fees for a home addition in Boston typically run $550–$2,225. Here's exactly which permits you need, what they cost, and how long MA review takes.
Always — an addition is new structure. Expect full plan review, zoning checks, and multiple inspections in Boston. Permit fees for a typical $111,830 home addition run about $550–$2,225 (valuation-based fee plus plan review), and MA plan review typically takes 3–8 weeks.
full permit with stamped plans and plan review
setback, lot-coverage, and height review
electrical, plumbing, and mechanical rough-ins
excavation and drainage in many jurisdictions
Nothing meaningful — every part of a home addition runs through permitting. Budget for it up front.
Building, Zoning, Trade permits, Site/grading permits apply when the scope includes full permit with stamped plans and plan review. Cosmetic-only scopes may be exempt.
Plan for $550–$2,225 in Boston — a valuation-based fee on a typical $111,830 project plus plan review.
Submit scope, drawings, and contractor license info to the Boston building department. MA plan review typically takes 3–8 weeks.
A complete Boston bid lists permit fees as a line item. If a bid omits permits — or suggests skipping them — analyze it before signing.
A typical Boston home addition runs $111,830. Check your contractor's bid — permits included — against live 2026 local data, free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.
Upload your contractor's estimate and get instant, data-backed analysis.
Analyze Your Bid