Permit fees for a ADU or garage conversion in Provo typically run $775–$3,125. Here's exactly which permits you need, what they cost, and how long UT review takes.
Always — converting space into a dwelling unit triggers full plan review, zoning approval, and utility sign-offs in Provo. Permit fees for a typical $155,673 ADU or garage conversion run about $775–$3,125 (valuation-based fee plus plan review), and UT plan review typically takes 2–4 weeks.
full plan review for the dwelling conversion
ADU ordinance compliance and occupancy approval
sewer, water, and electrical service connections
separate egress and smoke/CO requirements
Nothing meaningful — every part of a ADU or garage conversion runs through permitting. Budget for it up front.
Rapid Growth Quality Issues: Fast-paced construction in growing areas leads to quality concerns Utah County and Washington County have seen rapid growth with associated quality issues. Reddit recommends careful inspections of new construction.
Building, Zoning / occupancy, Utilities, Fire / egress permits apply when the scope includes full plan review for the dwelling conversion. Cosmetic-only scopes may be exempt.
Plan for $775–$3,125 in Provo — a valuation-based fee on a typical $155,673 project plus plan review.
Submit scope, drawings, and contractor license info to the Provo building department. UT plan review typically takes 2–4 weeks.
A complete Provo bid lists permit fees as a line item. If a bid omits permits — or suggests skipping them — analyze it before signing.
A typical Provo ADU or garage conversion runs $155,673. Check your contractor's bid — permits included — against live 2026 local data, free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.