Permit fees in Salt Lake City typically run $425–$1,700 for a mid-size project. Here's which work needs a permit, what it costs, and how long it takes.
Electrical/plumbing moves trigger permits; cabinet swaps alone may not.
Plumbing relocation and new circuits require permits.
Egress, framing, and electrical almost always permitted.
Structural — always permitted, plus plan review.
Permits + zoning/occupancy review required.
Multiple trade permits; often a single combined permit.
Most jurisdictions require a re-roof permit.
Often exempt unless structural sheathing changes.
Like-for-like often exempt; resized openings need a permit.
Decks over ~30in high or attached to the house need permits.
Structural + electrical — permitted.
New structure — permits + setbacks.
Mechanical permit for system swaps.
Height limits trigger permits; short fences often exempt.
Right-of-way/curb-cut permits common; resurfacing often exempt.
Cosmetic — generally no permit.
Cosmetic — no permit.
No permit (HOA approval may apply).
Rapid Growth Quality Issues: Fast-paced construction in growing areas leads to quality concerns Utah County and Washington County have seen rapid growth with associated quality issues. Reddit recommends careful inspections of new construction.
Get 2026 cost ranges for all 18 project types in Salt Lake City — then audit your contractor's bid free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.