Permit fees for a ADU or garage conversion in Savannah typically run $750–$2,950. Here's exactly which permits you need, what they cost, and how long GA review takes.
Always — converting space into a dwelling unit triggers full plan review, zoning approval, and utility sign-offs in Savannah. Permit fees for a typical $147,731 ADU or garage conversion run about $750–$2,950 (valuation-based fee plus plan review), and GA plan review typically takes 2–4 weeks.
full plan review for the dwelling conversion
ADU ordinance compliance and occupancy approval
sewer, water, and electrical service connections
separate egress and smoke/CO requirements
Nothing meaningful — every part of a ADU or garage conversion runs through permitting. Budget for it up front.
Termite Prevention: Georgia is in the highest termite risk zone in the US Homeowners report devastating discoveries of termite damage during remodels. Reddit consensus: any work touching the foundation or framing should include termite inspection and treatment plan.
Building, Zoning / occupancy, Utilities, Fire / egress permits apply when the scope includes full plan review for the dwelling conversion. Cosmetic-only scopes may be exempt.
Plan for $750–$2,950 in Savannah — a valuation-based fee on a typical $147,731 project plus plan review.
Submit scope, drawings, and contractor license info to the Savannah building department. GA plan review typically takes 2–4 weeks.
A complete Savannah bid lists permit fees as a line item. If a bid omits permits — or suggests skipping them — analyze it before signing.
A typical Savannah ADU or garage conversion runs $147,731. Check your contractor's bid — permits included — against live 2026 local data, free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.
Upload your contractor's estimate and get instant, data-backed analysis.
Analyze Your Bid