Permit fees for a ADU or garage conversion in Washington typically run $1,050–$4,200. Here's exactly which permits you need, what they cost, and how long DC review takes.
Always — converting space into a dwelling unit triggers full plan review, zoning approval, and utility sign-offs in Washington. Permit fees for a typical $209,682 ADU or garage conversion run about $1,050–$4,200 (valuation-based fee plus plan review), and DC plan review typically takes 4–8 weeks.
full plan review for the dwelling conversion
ADU ordinance compliance and occupancy approval
sewer, water, and electrical service connections
separate egress and smoke/CO requirements
Nothing meaningful — every part of a ADU or garage conversion runs through permitting. Budget for it up front.
High Construction Costs: DC has very high construction costs DC labor and permitting costs are among highest in US. Reddit warns that very low bids indicate problems.
Building, Zoning / occupancy, Utilities, Fire / egress permits apply when the scope includes full plan review for the dwelling conversion. Cosmetic-only scopes may be exempt.
Plan for $1,050–$4,200 in Washington — a valuation-based fee on a typical $209,682 project plus plan review.
Submit scope, drawings, and contractor license info to the Washington building department. DC plan review typically takes 4–8 weeks.
A complete Washington bid lists permit fees as a line item. If a bid omits permits — or suggests skipping them — analyze it before signing.
A typical Washington ADU or garage conversion runs $209,682. Check your contractor's bid — permits included — against live 2026 local data, free.
Data sources: Zonda Cost vs Value 2025; Houzz 2024 Cost Guides; BLS OEWS 2023; FRED regional price indices; Reddit homeowner & contractor reports.
Upload your contractor's estimate and get instant, data-backed analysis.
Analyze Your Bid